Customer
Relations:
Called
to confirm time and date of installation
Job done in a
timely manner
Job inspected
by homeowner & installer
Payment received
Customer given
receipt & warranty card
Job sign planted
at job
Installation:
Downspouts:
Properly
fastened to outlet flange
Top intermediate
is straight back to house
Wall pip is plumb
Pipe clips used
properly (2 for every section)
Clean and scratch
free
Bottom elbow
proper height
Locations are
on lowest side of house
Gutters:
Proper
"off-level" slope (1/4" per 10")
End caps sealed
properly
Miters sealed
properly
Hangers used
every 24"
Hangers fastened
properly
Gutter face clean
and scratch free
Drip edge zipped
on hidden hanger applications
Gutters extended
1" past roof at all ends
Back of gutter
crimped at outlet for proper flow
Holes caulked
from pre-existing roof strap hanger
Cleanup:
All
old gutters removed and old hangers & nails picked up
All saw chips
and other debris swept up and removed
All ladders and
tools loaded into truck.
|